feedback
评价本网页


需要帮助?


产品更改通知

Change Notification #   10863
Revision  
Type of Notification   INITIAL PRODUCT/PROCESS CHANGE NOTIFICATION
Change Title   Initial Notification for Bipolar Power Wafer Fab Transfer from Toulouse, France to Phoenix, Arizona
Issue Date   2001-03-13
Affected Product Family   DISCRETES
Description   Initial Notification, 120 Days prior to the change will be followed by appropriate Final Process Change Notices with supporting data a minimum of 60 days prior to implementation. ON Semiconductor wishes to notify its Customers that the Bipolar Power Wafer Manufacturing Operation located in Toulouse-France will be transferred to Phoenix, Arizona. At the same time, the wafer diameter will be changed from 125mm to 150mm. The entire Wafer manufacturing transfer and qualification process will be done in 4 major phases, each phase corresponding to the qualification of all devices using a specific major Bipolar Power Technology. 1st phase, all Product Lines built with the Epi Base Technology will be qualified and transferred. 2nd phase, all Product Lines using the Power Base Technology will be qualified and transferred. 3rd phase, all Product Lines built with the Low Voltage Planar Technology will be qualified and transferred. 4th phase, all Product Lines built with the High Voltage SIPOS Planar Technology will be qualified and transferred.
Key Items Affected by Change   Fab Site
 
Key Milestones  
Effective Date:   2001-06-28
Sample Info:   None
Possible Replacements   N/A

For more information on this Process Change Notification, please contact your local ON Semiconductor sales office.

之前浏览的产品
清除列表

技术支援
   
 

登记以获PCN(产品更改通知)最新信息!
  安森美半导体与PCNAlert合作,提供产品更改通知与更新通知。这服务能自动并及时通知有关产品更改和过时的信息。您可根据个人所需进行定制,方便您只收到您指定产品的产品更改通知(PCN)。

此服务由安森美半导体与PCNAlert免费为您提供。